, , ,

Zero Waste Advisory Commission to recommend up to $2.1 million RRS rate studies; FM812 landfill history next

Austin’s Zero Waste Advisory Commission meets Oct. 14 on an up-to-$2.1M RRS rate-studies contract and a historical overview of the closed FM812 landfill.

Share this storyXFacebookLinkedIn

Municipal recycling facilities, Montgomery County, Md., 2007. U.S. EPA photo, public domain.

Austin’s zero-waste goal depends on knowing how much trash, recycling, and organics the city actually captures — not only on ARR routes but citywide. The commission is asked to recommend a multi-year consultant contract for those studies, then hear a history of the closed FM812 landfill near the airport and an operations update that includes the new single-stream recycling contracts.

Preview: City of Austin Zero Waste Advisory Commission, regular meeting
Wednesday, Oct. 14, 2026, 6 p.m. CT. Austin City Hall, Room 1001 (Council Chambers), 301 W. 2nd St. Some commissioners may join by video. The meeting airs on ATXN.

The city has posted the agenda (EDIMS 482830), an event page and meeting documents, with backup linked below.

Material rate studies contract with RRS (Item 2). Commissioners are asked to recommend that Council authorize a contract with Resource Recycling Systems, Inc. d/b/a RRS for an initial three-year term plus up to three one-year extensions, not to exceed $2,100,000. FY26–27 funding of $350,000 is in ARR’s operating budget; later years depend on future budgets (RCA, EDIMS 482955).

  • The work covers three studies: a communitywide capture rate study, a per-capita disposal rate study, and a combined diversion rate and waste characterization study, for both ARR-collected and non-ARR trash, recycling, and organics (residential and commercial).
  • Staff tie the studies to the 2023 Austin Resource Recovery Comprehensive Plan and the city’s goal of cutting landfill disposal 90% by 2040.
  • Solicitation RFP 1500 RGW3011 drew five offers (April 27–June 2, 2026, with an extension). Evaluators scored RRS best on experience, approach, price, and local/small-business preference. No MBE/WBE subcontracting goals were set because staff found insufficient subcontracting opportunities.
  • Contract authorization table in the RCA: initial term $1,050,000 (3 years), then three optional $350,000 years, totaling $2.1 million over up to six years.
  • Council vote: The Oct. 22, 2026, Council draft agenda Item 30 is the same RRS material-rate-studies contract at the same $2.1 million cap (EDIMS 482959). The ZWAC RCA cover sheet lists Council 10/22/2026; the RCA header also shows 11/05/2026. The Oct. 22 draft agenda is the most recent Council posting for the contract.

FM812 Landfill historical overview (Item 4). Gena McKinley, ARR deputy director, presents (EDIMS 482957).

  • Site: about 391 acres in Travis County near Austin-Bergstrom International Airport; MSW permits 360 and 360A (later Subtitle D); operations from the 1960s to 2009.
  • In 1995, TCEQ approved converting the site to a Type IV facility (construction, demolition, and land-clearing debris only — no household putrescible waste). Type I operations suspended February 1999; Type IV began by June 1999.
  • ARR C&D tonnage peaked around 33,000 metric tons in 2005 and fell to 3,628 by 2008. Uncompacted load fees moved from $5.50 to $6.50 per cubic yard across the 2000s.
  • Current projects listed on the slides: a 10-acre Austin Energy lay-down/parking yard off FM 973; a 58.224-acre solar array (UPower selected); and leachate-line construction (about 180 days from start).
  • Context: On June 10, 2026, ZWAC voted 7-0 to recommend that ARR staff study the feasibility of a C&D recycling diversion facility on the closed FM812 site (per approved minutes on the commission meetings page). This briefing is the historical overview, not a reopening vote.

ARR operational and administrative projects (Item 5). McKinley’s director’s monthly report (EDIMS 482958) includes:

  • Recycling Reset: Council on July 23 authorized the third and final amended single-stream recycling schedules with Circular Services and Texas Disposal Systems; execution effective Oct. 1, 2026.
  • Universal Recycling Ordinance online reporting mailer: more than 15,000 reminders to multifamily and business managers for diversion plans due Oct. 1–Feb. 1 (austintexas.gov/uro).
  • Partnership with The Recycling Partnership on a curbside capture/set-out study (baseline audit March 2026; four-week set-out study launched September 2026; education November 2026–March 2027; final audit summer 2027).
  • Solicitation tracker lists the Multiple Material Rate Studies contract as preparing for Council.

Also on the agenda. Item 3: 2027 meeting schedule (second Wednesdays at 6 p.m. in Council Chambers, with March 10 and Dec. 8 cancelled on the draft) (EDIMS 482956).

How to take part. Speak in person, or register to speak by phone by noon Tuesday, Oct. 13, with Gustavo Valle at Gustavo.Valle@austintexas.gov or 512-974-4350. Speakers get three minutes (first five general speakers). Watch on ATXN.

How the pieces fit. ZWAC recommends; Council awards. Draft Council Item 30 on Oct. 22 is the matching RRS contract. FM812 reuse questions also touch Austin Energy (solar/lay-down) and airport-adjacent land use.

Municipal recycling facilities in Montgomery County, Maryland, 2007. U.S. EPA photo, public domain, via Wikimedia Commons.